摘要 云峰大坝修建在高寒山区,在施工期部分浇筑块混凝土早期受冻,降低了混凝土抗渗性能;坝基存在大断层、右岸坝头陡坡和左岸坝头存在缺陷对坝体稳定不利。由于坝体渗漏,蓄水运行后,大坝溢流面、上下游面冻融和冻胀破坏比较严重,不得不进行补强加固。对云峰水电站大坝防渗性能进行分析与评价。 Yunfeng dam is located at alpine mountainous region,during the early period of the construction;block concrete was frozen,reducing its anti-seepage performance.Unfavorable factors such as big fault in its foundation,defects in the dam head abutment slope of the right side bank and in the left side bank head exist.Due to dam body seepage,after the operation,severe damages like freeze-thaw and frost heave onto the spillway face and upper and lower stream face.So reinforcement of the dam has to be done.This paper analyzed and evaluates the dan anti-seepage performance in Yunfeng Hydraulic Power.
作者 宋恩来
出处 《东北电力技术》 2011年第3期1-7,共7页 Northeast Electric Power Technology
关键词 混凝土受冻 扬压力 漏水量 补强加固 陡坡坝段 Concrete frozen Uplift pressure Leakage quantity Reenforcment Abutment slope segment
  • 相关文献

参考文献1

  • 1DL5108-1999.混凝土重力坝设计规范[S].[S].,..

共引文献95

同被引文献20

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部