摘要
针对在高拱坝中普遍存在的陡坡坝段温度应力集中问题,以典型工程为例,采用一种新的结构分缝形式,应用三维有限元程序,对陡坡坝段从施工期到运行期的温度场、应力场进行仿真计算,通过改变结构分缝形式,为解决高拱坝陡坡坝段的应力集中问题寻找一条新的途径。
So far as the problem of thermal stress concentration widely existed in the steep slope section of high arch dam is concemed, a new type of structural jointing is adopted by taking a typical project as the actual case, for which the temperature field and stress field of the steep slope section of the dam during the period from construction to operation is simulated based on 3- Dfinit element program. Through the modification of the structural jointing, a new method to solve the problem of the thermal stress concentration in the steep slope section of the dam is found out.
出处
《水利水电技术》
CSCD
北大核心
2007年第6期53-55,共3页
Water Resources and Hydropower Engineering
关键词
高拱坝
陡坡坝段
应力集中
结构分缝
仿真计算
徐变应力
high arch darn
steep slope of dam section
stress concentration
structural jointing
simulation calculation
creep stress