摘要 以等风险度原则为基础,以各检修时段风险度方差最小为目标函数,建立了发电机组检修计划模型,提出了最小累积风险度法。该启发式求解方法采用半不变量法结合Gram-Charlier级数展开法求解系统的风险度,通过寻找检修区间内累积风险度最小的区间确定待检修机组的检修位置。以IEEE-RTS系统为算例的机组检修计划结果验证了最小累积风险度法的有效性。 Based on equal risk algorithm principle,the paper establishes generating unit maintenance scheduling model using object function of maintenance period risk algorithm minimum variance,and proposes minimum cumulative risk algorithm.The algorithm adopts cumulant and Gram-Charlier series expansion method to solve risk algorithm of system,as well as determines maintenance position through searching minimum cumulative risk range in maintenance region.The unit maintenance scheduling using IEEE-RTS as algorithm example has proofed the effectiveness of minimum cumulative risk algorithm.
出处 《青海电力》 2011年第1期16-19,共4页 Qinghai Electric Power
关键词 等风险度原则 Gram-Charlier级数展开 机组检修计划 最小累积风险度法 半不变量 equal risk algorithm principle Gram-Charlier series expansion unit maintenance scheduling minimum cumulative risk algorithm cumulant
  • 相关文献

参考文献11

  • 1丁明,冯永青.发电机组检修计划的可靠性和经济性研究[J].中国电力,2001,34(7):22-25. 被引量:19
  • 2丘昌涛 岳占明 李朝华.用等风险度法制定发电机组检修计划的计算机程序.东北电力学院学报,1983,:83-93.
  • 3江帆 阎超.按最大累积容量裕度制定发电机组检修计划.重庆大学学报,1986,.
  • 4Kendall M, Stuart A. The advanced theory of Statistics [ M]. London : C. Griffin, 1977.
  • 5Tian W D, Sutanto D,Lee Y B, et al. Cumulant based probabilistic power system simulation using Laguerrepolynomials[J]. IEEE Transacti on sonEnergy Conver- sion, 1989,4(4) :567 -574.
  • 6Stremel J P, Jenkins R T. Maintenance Scheduling Un- der Uncertainty[ J ]. IEEE Transactions on Power Appa- ratus and Systems, 1981 ,PAS- 100(2) :460 -465.
  • 7Rau N S, Toy P, Schenk K F. Expected Energy Produc- tion Costs by the Method of Moments[J].IEEE Trans- actions on Power Apparatus and Systems, 1980, PAS- 99(5 ) : 1908 - 1917.
  • 8Booth R R. Power System Simulation Model Based on Probability Analysis[J]. IEEE Transactions on PowerA- pparatus and Systems, 1972, PAS - 91 ( 1 ) :62 - 69.
  • 9陈刚.一种制订孤立系统和辐射形互联系统机组检修计划的新方法[J].中国电机工程学报,1989,9(3):34-40. 被引量:2
  • 10Subcommittee P M. IEEE Reliability Test System [ J ]. IEEE Transactions on Power Apparatus and Systems, 1979, PAS - 98(6) :2047 - 2054.

二级参考文献45

  • 1夏清,王少军,相年德.时序负荷曲线下电力系统概率性生产模拟[J].中国电机工程学报,1994,14(3):21-28. 被引量:14
  • 2李林川,王锡凡,王秀丽.基于等效电量函数法的互联电力系统随机生产模拟[J].中国电机工程学报,1996,16(3):180-184. 被引量:16
  • 3朱祚云,孙健刚,毕毓良,潘思安.风力发电对上海电网的影响[J].上海电力,2007,20(1):30-33. 被引量:3
  • 4庞爱莉.风力发电场接入后对系统的影响[J].上海电力,2007,20(1):33-35. 被引量:19
  • 5王锡凡.电力系统随机生产模拟的等效电量函数法[J].西安交通大学学报,1984,18(6).
  • 6Booth R R. Power system simulation model based on probability analysis[J]. IEEE Transactions on Power Systems, 1972, 91(1): 62-69.
  • 7Schenk K F, Misra R B, Wassos S, et al. A new method for the evaluating of expected energy generation and loss of probability [J]. IEEE Transactions on Power Systems, 1984, 103(2): 294-303.
  • 8Wang X. Equivalent energy function approach to power system probabilistic modeling[J]. IEEE Transactions on Power Systems, 1988, 3(3):823-829.
  • 9Rau N S, Toy P, Schenk K F. Expected energy production costs by the method of moments[J]. IEEE Transactions on Power Apparatus and Systems, 1980, 99(5): 1908-1917.
  • 10Stremel J P, Jenkins R T, Babb R A, et al. Production costing using the cumulant method of representing the equivalent load curve[J].IEEE Transactions on Power Apparatus and Systems, 1980, 99(5): 1947-1956.

共引文献109

同被引文献20

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部