期刊文献+

基于全寿命周期的火电工程建设管理研究 被引量:4

Research of construction management on thermal power project based on life cycle theory
在线阅读 下载PDF
导出
摘要 针对火电工程建设具有很强的复杂性和特殊性,将全寿命周期理论应用于火电工程建设的控制和管理领域,建立了集火电工程建设的质量、进度、投资和安全为一体的集成控制概念模型和管理组织模式,论述了火电工程建设过程集成控制流程,并搭建了全寿命周期管理下的火电工程建设信息管理平台。工程应用实例表明,所提出的理论和搭建的平台能有效地提高火电工程建设管理水平,为火电工程建设的控制与管理提供理论与技术支持。 A method of applying life cycle theory into the control and management on thermal power project construction domain was proposed to fit the strong complexity and particularity in the construction process.An integrated control conceptual model on thermal power project construction was established which consists of quality,schedule,investment and safety.And the organization mode of integrated control was set up.Then,the integrated control flow was illustrated in detail.Finally,an information management platform on thermal power project was built up based on life cycle theory.The application result shows that the theory and the platform provide an effective technical support for the construction and management of the thermal power project.
作者 张晓鲁
出处 《中国工程科学》 2011年第4期68-74,共7页 Strategic Study of CAE
关键词 全寿命周期 集成控制 建设管理 信息管理平台 火电工程 life cycle integrated control construction management information management platform thermal power project
  • 相关文献

参考文献8

二级参考文献31

  • 1舒友国,许发艳,章伟星.造船数据互用性与XML和STEP[J].中国船检,2004(11):78-79. 被引量:2
  • 2刘伟,赵德鹏,王德强,郭日益.基于XVL技术的海底地形生成方法[J].系统仿真学报,2006,18(1):264-266. 被引量:2
  • 3刘云华,刘俊,陈立平.产品三维数据模型轻量化表示实现[J].计算机辅助设计与图形学学报,2006,18(4):602-607. 被引量:29
  • 4DING Lian, BALL A, MATTHEWS J, etal. Annotation of lightweight formats for long-term product representations [J]. International Journal of Computer Integrated Manufacturing, 2009, 22 (11) : 1037-1053.
  • 5XU Xun, NEE A Y C. Advanced Design and Manufacturing Based on STEP [M]. Berlin: Springer, 2009.
  • 6Robert O B. Analysis of current department of defense risk management practices in weapon system acquisition [ A]. A case study of the advanced amphibious assualt vehicle PDRR and SDD risk management practices [ D ] California: Naval Postgraduate School, 2003.
  • 7James P R. A risk management model for the federal acquisition process [ D ]. California: Naval Postgraduate School, 1999.
  • 8Ansell J W. Risk: analysis assessment and management [ M ]. New York: New York Press,1992. 34~63.
  • 9陈军伟.[D].北京:装甲兵工程学院,2004.
  • 10刘洁.[D].北京:北京大学研究生院,2002.

共引文献46

同被引文献7

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部