摘要
本文对TBM掘进速度与地质条件的关系作了初步研究,就如何用统计分析方法对TBM的施工进度作出科学预测,进行了探讨,并在一定范围内接受了实践的检验。
The paper makes a preliminary research on the telations between the tunnelling speed of TBM and the geological conditinos of tunnel. By utilizing statistical analysis method,a scientific fore cast on construction rate of progress for TBM is put forward. The result of this exploration has been verified by practice in certain extent.
出处
《铁道工程学报》
EI
1999年第2期94-98,共5页
Journal of Railway Engineering Society
关键词
TBM
施工进度
隧道
全断面隧道
掘进机
TBM(Tunnel Boring Machine)
construction rate of progress
geological conditions
statistical analysis
scientific forecast