摘要
针对施工方案综合评价中各指标的不相容性和信息不完全性,提出基于灰色物元分析的施工方案综合评价方法。该方法将待评价方案、评价指标及其特征值作为灰色物元,通过计算综合关联度得到最优的施工方案。用实例与模糊优化理论模型进行了对比,得到一致的结果。
Aimed at the incompatibility and greyness of indices in construction scheme comprehensive evaluation,a comprehensive evaluation method based on fuzzy matter element analysis is presented. The method takes the scheme to beevaluated, evaluating indices and its characteristic value as matter elements, and optimum scheme is obtained by calculating the comprehensive relational degree. Compared it with fuzzy optimization theory model, the results achieved is consitent coincident.
出处
《建筑技术开发》
2011年第3期59-61,共3页
Building Technology Development
关键词
灰色物元分析
工程施工方案
综合评价
可拓集合
关联函数
fuzzy matter element analysis
construction scheme
comprehensive evaluation
extension sets
relational function