期刊文献+

考虑外包的并行调度随机期望值模型 被引量:8

Stochastic expected value model about parallel scheduling considering outsourcing
在线阅读 下载PDF
导出
摘要 在已有并行机器调度随机期望值模型的基础上,考虑了以产品外包为能力拓展形式的现代生产模式,建立了基于外包决策的并行调度随机期望值模型.该模型以带有拖期惩罚函数的最大化利润为目标,以遗传算法这种进化的启发式计算方法寻找近优解.同时引入虚拟任务的概念,实现了对外包情形下机器调度问题的有效处理和简化.实例证明,该模型在用于解决考虑外包的并行机器调度问题时是可行的. Based on the traditional parallel machine scheduling model,this paper takes the modern mode of production in the form of products outsourcing into consideration for capacity expansion,and sets up a stochastic expected value model about parallel scheduling based on outsourcing decision-making.This model seeks a near-optimal solution by using genetic algorithm which is evolutional and heuristic,and takes the profit maximization with a delay punish function as objective.Meanwhile,by introducing the concept of virtual job,it realizes the effective treatment and simplification for the machine scheduling problem in the case of outsourcing.Examples show that the model is feasible to solve the parallel scheduling problem considering outsourcing.
出处 《系统工程学报》 CSCD 北大核心 2011年第1期91-97,共7页 Journal of Systems Engineering
基金 国家自然科学基金资助项目(70471049) 天津市教委科技发展基金资助项目(20061005)
关键词 生产外包 机器调度 智能算法 虚拟任务 production outsourcing machine scheduling intelligence algorithm virtual job
  • 相关文献

参考文献9

二级参考文献33

  • 1张超勇,饶运清,李培根,刘向军.求解作业车间调度问题的一种改进遗传算法[J].计算机集成制造系统,2004,10(8):966-970. 被引量:54
  • 2史为民,陈青云,乔晓军.日光温室黄瓜叶片光合速率模型及其参数确定的初步研究[J].农业工程学报,2005,21(5):113-118. 被引量:31
  • 3刘琦.[D].上海: 华东理工大学,2000.
  • 4[1]Wang D W, et al. Scheduling grouped jobs on single machine with genetic algorithm[J]. Computers and Industrial Engineering, 1999, 36:309-324
  • 5[2]Webster S, Baker K R. Scheduling groups of jobs on a single machine[J]. Operations Research, 1995, 43:692-703
  • 6[3]Wang D, Fang S -C,Nuttle H L. Soft computing for multi-customer due-date bargaining[J]. IEEE Transactions on SMC Part C: Application and Reviews, 1999, 29(4):566-575
  • 7[4]Wang D, Fang S -C,Nuttle H L. Fuzzy rule quantification and its application in fuzzy due-date bargaining[C]. Proceeding of IFSA Congress 1999, Taiwan, August, 1999
  • 8[5]Hyer N l, Wemmerlov U. Group technology in the US manufacturing industry: A survey of current practices[J]. International Journal of Production Research, 1989, 27:1287-1304
  • 9[6]Potts C N, Wassenhove L V. Integrating scheduling with batch and lot-sizing: A review of algorithms and complexity[J]. Journal of Operations Research Society, 1992, 43:395-406
  • 10[7]Panwalkar S S, Iskander W. A survey of scheduling rules[J]. Operation Research, 1997, 25:45-61

共引文献46

同被引文献83

引证文献8

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部