摘要
就Ⅴ型滤池施工中所遇到的后浇带施工、表冲孔施工、施工缝的技术处理、预埋件的变形处理、滤板安装的平整度控制等难题进行了分析。
Some difficult operations in construction of V filters such as the placing of post pouring belt,punched hole cutting for instrumentation,technical treatment of construction joint,correcting of deforming of built in fittings and the planeness control in installation of filtering boards are discussed and measures to handle them are given.
出处
《给水排水》
CSCD
北大核心
1999年第11期71-73,共3页
Water & Wastewater Engineering