丰满大坝的全面修复与加固 被引量:3

Full repair and reinforce ment of Feng mandam
在线阅读 下载PDF
导出
摘要 丰满水电站于1937 年开始建设, 1943 年第1 台机组发电, 1945 年完成混凝土浇筑量的89 % , 1953 年完成续建改建工程。丰满大坝由于始建于30 年代, 存在问题较多, 如防洪标准低, 抗震能力不够, 坝体混凝土质量差、老化严重等。针对存在的诸多问题, 对大坝采取了溢流面修补, 上下游坝面外包钢筋混凝土, 坝顶加高,预应力锚索加固, 坝体防渗灌浆与排水等综合修复加固措施。以上工程措施已于1997 年完成并通过竣工验收,效果显著, 从而消除了大坝的主要病害, 保证了大坝安全稳定运行。 The Fengman Hydropower Station started to be builtin 1937 . Its first generating unit was put into operation in 1943 .89 % of con crete pouring volume were competed in 1945 . It’s extended and reconstructed works were completed in 1953 . Because it started to be builtsince 1930s ,the Fengman dam remains many problems such as low flood control stangard ,inadrquate earthquake resistant capacity ,poor con crete quality of dam body ,serious ageing , etc . To counter these problems ,the following comprehensive repair and reinforcement measures forthe dam have been taken : repairing the overflow surface , covering the reinforced concrete on the downstream and upstream dam surfaces ,heightening the dam crest , using the pre - stressed anchor cable to strengthen the dam , adopting seepage grouting and drainage in the dambody . All the above engineering measure were completed in 1997 and passed the final acceptance . These measures have reached obvious effec tiveness ,removed the main dangers of the dam and guaranteed the safe and stable operation of the dam .
机构地区 丰满发电厂
出处 《水力发电》 北大核心 1999年第8期46-48,共3页 Water Power
关键词 大坝 补强加固 工程措施 水电站 repair ,reinforcement , engineering measure , Fengman dam
  • 相关文献

同被引文献25

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部