向家坝水电站左岸主体及导流工程混凝土施工技术 被引量:5

Concrete Construction for Left Bank Main Works and Diversion Project of Xiangjiaba Hydropower Station
在线阅读 下载PDF
导出
摘要 向家坝水电站左岸主体及导流工程项目多、施工强度高、温控要求高、大型沉井群施工难度大。施工中,对大型沉井群混凝土施工技术、大坝混凝土快速施工技术、混凝土配合比优化、"四新"技术的应用等方面进行了研究探讨,保证了施工进度、质量和安全,并荣获多种奖项。 The left bank main works and diversion project of Xiangjiaba Hydropower Station has many characteristics,such as large number of construction projects,high construction intensity,difficult concrete temperature control and difficult construction for large-scale sunk shafts.During the period of construction,the concrete construction technology for sunk shaft,rapid concrete dam construction technology,concrete mix optimization and the application of " four new technologies" are studied.The construction schedule,quality and safety are ensured after the application of these technologies.
出处 《水力发电》 北大核心 2010年第2期10-12,共3页 Water Power
关键词 大坝 导流工程 混凝土 施工技术 向家坝水电站 dam diversion project concrete construction technology Xiangjiaba Hydropower Station
  • 相关文献

同被引文献36

引证文献5

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部