下锚段分离式模板衬砌台车成套设备与施工技术 被引量:4

Set Equipment and Construction Technology of Anchor-section Separable-template Lining Platform
在线阅读 下载PDF
导出
摘要 目前铁路客运专线均为电气化高速铁路,设有绝缘下锚段。绝缘下锚段开挖方法按一般断面方法开挖,主要是二衬施工存在一定的困难,因为绝缘下锚段衬砌轮廓线比隧道一般断面大,且纵向长度均很短,所以在施工绝缘下锚段二衬时传统施工方法是用工字钢做拱架支撑,拼装小模板做面板,人工浇筑混凝土。由于此种施工方法存在一定的问题,结合以往施工经验,自行研制了分离式衬砌台车工法施工下锚段二衬。 Nowadays,railway PDLs are electrified high-speed railway,with insulation anchor sections.With conventional sectional method to excavate,the excavation method of insulation anchor sections faces some difficulties in second lining,as the outline of insulation anchor section lining is bigger than the ordinary tunnel sections,and the longitudinal length is short.Conventional construction method for second lining of insulation anchor section is to use I-beam as arching support, and assembled small templates as the panel,with man-made concrete placement.Since there are some problems in the conventional method,combined with previous construction experiences,anchor section second lining with separable lining platform working method has been developed.
作者 王学忠
出处 《铁道建筑技术》 2010年第10期89-92,95,共5页 Railway Construction Technology
关键词 大断面隧道 下锚段 衬砌台车 large sectional tunnel anchor section lining platform
  • 相关文献

参考文献2

二级参考文献4

  • 1《建筑结构静力计算手册》编写组·建筑结构静力计算手册(第二版)[K].北京:中国建筑工业出版社,2005.
  • 2《钢结构设计手册》编辑委员会.钢结构设计手册[K].北京:中国建筑工业出版社,2004.
  • 3邱宣怀,等.机械设计手册[K].北京:机械工业出版社,1991.
  • 4GB50017-2003.钢结构设计规范[S].[S].,..

共引文献17

同被引文献32

引证文献4

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部