鄂东大桥施工期结构行为与施工监控关键技术 被引量:7

Structure Behavior and Construction Monitoring Key Technology in Construction of Edong Changjiang River Bridge
在线阅读 下载PDF
导出
摘要 鄂东长江大桥为千米级混合梁斜拉桥,通过研究探明了鄂东长江大桥施工期结构行为特点,指出了超大跨度的混合梁斜拉桥具有非线性特征突出、边中跨的结构行为有一定的独立性等有别于全钢箱梁斜拉桥的特点。从施工期结构行为入手,就总体控制理念、边中跨控制重点、边中跨线形控制方法、施工期中跨钢箱梁应力调控、边跨应力控制、拉索张拉控制等关键技术问题进行了深入探讨。施工实践表明:实测结果与理论结果吻合较好,线形情况与应力情况对应,结构处于可控状态,证实了上述关键技术的有效性。 The main bridge of Edong Changjiang River Bridge is a hybrid girder cable-stayed bridge with 1km main span.The structure behavior features of Edong Changjiang River Bridge's construction are introduced,including obvious non-linearity and independence between mid-span and side span in construction period,which are different from the features of steel box girder cabled bridge.According to structural behavior in construction period,overall control concepts,control key factors,line shape control method,stress control method in mid-span and side span,cable tension control method are discussed.Construction experience indicates that the theoretical calculation is in well accordance with the field results;line shape conditions correspond to the stress conditions and the structure is under control,which proves the availability of those key methods.
出处 《重庆交通大学学报(自然科学版)》 CAS 北大核心 2010年第5期688-692,共5页 Journal of Chongqing Jiaotong University(Natural Science)
关键词 斜拉桥 施工控制 线形控制 应力控制 cable-stayed bridge construction control line shape control stress control
  • 相关文献

参考文献8

二级参考文献12

  • 1张铭.武汉阳逻长江公路大桥主塔设计[J].公路,2006,51(5):67-72. 被引量:4
  • 2Virlogeux M. Recent evolution of cable-stayed bridges [ J ]. Engineering Structures, 1999, 21 : 737-755.
  • 3Fujisawa N, Tomo H. Computer-aided cable adjustment of stayed bridges [ C ]//IABSE. 1985 : 181-190.
  • 4Breen J E. Controlling twist in precast segment concrete bridge[J]. PCI Journal, 1985, 4.
  • 5Furukawa K, Inoue K, Nakayama H, et al. Studies of the management of cable-stayed bridges under construction using multiobjective programming method [ C ]//Proceedings of Japanese Society of Civil Engineering. Japan : 1986 : 1-6.
  • 6Sakai F, et al. Construction control system for cable-stayed bridges[C]//Proe. IABSE. 1988, 92(85) : 147-152.
  • 7Sakai F, et al. Application of construction control system to erection of stiffening truss girder of Rainbow Bridge [ C ]// Proc. Inter. Conf. Bridge into 21 Century. Hong Kong: 1994 : 459-466.
  • 8Seki F, Tanaka S. Construction control system for cablestayed bridge [ C ]// Proceeding of IABSE. 1988, 92 (85) : 181-190.
  • 9Manabe Y, Hirahara N, Mukasa N, et al. Accuracy control on the construction of Tatara Bridge [ C ]//IABSE Conference. Malmo: 1999.
  • 10Li Qiao, Dong Xuewu, Huang Can, et al. Sensitivity analysis of structural parameters for super-span cablestayed bridge and its application[ C ]//The Eleventh East Asia-Pacific Conference on Structural Engineering & Construction ( EASEC-11 ). Taipei : 2008.

共引文献92

同被引文献63

引证文献7

二级引证文献70

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部