期刊文献+

MES合同计划排程的研究应用 被引量:10

Research and Application of the Order Planning and Scheduling in MES
在线阅读 下载PDF
导出
摘要 针对钢铁行业中期计划排程所遇到的瓶颈工序、库存和准时交货等问题,提出了合同计划排程。合同计划排程是高级计划排程的一个分支,其采用ToC+TS相结合的中期计划理念。考虑到按照基于规则的排序方式很难得到优化的结果,所以引入了TS智能算法对合同计划进行建模优化。通过实际使用表明,合同计划排程系统有助于解决钢厂生产计划问题。 Aiming at the problems occurred in medium term planning and scheduling for iron and steel industry,e.g.,bottleneck working procedure,inventory and delivery on time,the order planning and scheduling(OPS) is proposed.The OPS is one of the branches in advanced planning and scheduling(APS),it adopts the medium term planning and scheduling concept that is combining ToC+TS.In consideration of it difficult to obtain optimal result based on rules,thus the TS intelligent algorithm is introduced to do optimal modeling for order planning.The practice indicates that the OPS proposed is helpful to solve the problem of production planning in steel works.
作者 孙裕
出处 《自动化仪表》 CAS 北大核心 2010年第10期35-37,41,共4页 Process Automation Instrumentation
关键词 制造执行系统 ERP 合同计划排程 流程 禁忌搜索算法 MES Enterprise resource planning Order planning and scheduling Flow Taboo search algorithm
  • 相关文献

参考文献6

  • 1王蔚林.冶金MES中优化排程技术的应用[C]∥第五届MES(制造执行系统)开发与应用专题研讨会,2006.
  • 2Cong L Q, Bi Y J, Wei Z. The research and application of MES key technology[C]//Proceedings of the Second Baosteel Biennial Academic Conference, Shanghai : Shanghai Scientific and Technotogieal Literature Publishing House,2006:246 - 250.
  • 3汤洪博.钢铁企业MES中的生产计划管理模式[J].控制工程,2005,12(6):577-579. 被引量:18
  • 4高德拉特.目标[M].北京:电子工业出版社,1999.
  • 5肖智军.精益生产方式JIT[M].北京:海天出版社,2005.
  • 6王凌,郑大钟.邻域搜索算法的统一结构和混合优化策略[J].清华大学学报(自然科学版),2000,40(9):125-128. 被引量:10

二级参考文献11

  • 1张志檩.国内外制造执行系统(MES)的应用与发展[J].自动化博览,2004,21(5):5-11. 被引量:43
  • 2王凌.混合优化策略和神经网络中若干问题的研究[M].北京:清华大学,1999..
  • 3[5]Tang L X,Liu J Y,Rong A Y,et al.Modeling and a genetic algorithm solution for the slab stack shuffling problem when implementing steel rolling schedules[J].International Journal of Production Research,2002,40(5):1583-1595.
  • 4[6]Tang L X,Luh P B,Liu J Y,et al.Steel-making process scheduling using Lagrangian Relaxation[J].International Journal of Production Research,2002,40(1):55-70.
  • 5[7]Tang L X,Liu J Y,Rong A Y,et al.A review of planning and scheduling systems and methods for integrated steel production[J].European Journal of Operational Research (Invited Review),2001,133(1):1-20.
  • 6[8]Tang L X,Liu J Y,Rong A Y,et al.A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex[J].European Journal of Operational Research,2000,124 (2):267-282.
  • 7王凌,学位论文,1999年
  • 8唐立新,杨自厚,王梦光.基于准时制的炼钢-连铸生产调度问题研究[J].自动化学报,1998,24(1):9-15. 被引量:47
  • 9唐立新,杨自厚,胡国奋.板坯最优倒垛问题的有效启发式算法[J].系统工程学报,2001,16(2):121-127. 被引量:15
  • 10柴天佑,金以慧,任德祥,邵惠鹤,钱积新,李平,桂卫华,郑秉霖.基于三层结构的流程工业现代集成制造系统[J].控制工程,2002,9(3):1-6. 被引量:139

共引文献26

同被引文献56

引证文献10

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部