5[3]Kevin R.GUE,George L.Nemhauser,Mario Padron.Production Scheduling in Almost Continuous Time[J].ⅡE Transactions,1997,(29):391-398.
6[4]Mohammed F.Fahmy,MD Salim.A Model for Production Scheduling and Sequencing Using Constraints Management and Genetic Algorithm[R].Ahmad Nadeem Choudhry University of Northern Iowa,December,2000.
8[6]Mark Lawley,Spyros Reveliotis,Placid Ferreira.Flexible Manufacturing System Structural Control and the Neighborhood Policy,Part2.Generalization,Optimization,and Efficiency[J].ⅡE Transaction,1997,29:889-899.
9[7]H.Pierreval,L.Tautou.Using Evolutionary Algorithms and Simulation for the Optimization of Manufacturing Systems[J].ⅡE Transactions,1997,(29):181-189.