期刊文献+

修建高速铁路是京沪铁路扩能的需要 被引量:2

High-speed Railway Construction, the Need of Expanding Traffic Capacity of the Beijing - Shanghai Railway
在线阅读 下载PDF
导出
摘要 阐述了现有京沪铁路的运输繁忙程度;论证了现行《铁路区间通过能力计算办法》的可行性和合理性;通过分析当前京沪线通过能力的利用程度,证明京沪线的运能已无潜力可挖;列举了采用摆式列车、磁悬浮列车实现高速客运的弊病,从而得出修建高速铁路是京沪线扩能的最佳选择的结论。 The article expounds the busy transportation of the existing Beijing- Shanghai railway, demonstrates the feasibility and reasonability of 'Railway Sections Carrying Capacity Calculation Methods'. Through analyzing the utilization of the Beijing- Shanghai line capacity at present, it clarifies that no potentials can be tapped in traffic capacity of the Beijing - Shanghai line and lists drawbacks in case of using tilting train or Ma-glev train to realize high-speed passenger traffic, so as to draw the conclusion that to build a high-speed railway is the best choice to expand traffic capacity of the Beijing -Shanghai line.
作者 何邦模
出处 《中国铁路》 1999年第6期9-13,共5页 China Railway
关键词 区间通过能力 挖潜扩能 高速铁路 京沪线 section's carrying capacity, potential tapping and capacity expansion, high-speed railway, Beijing-Shanghai line
  • 相关文献

同被引文献14

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部