实施“精细”管理降低桩基施工成本

Carrying out "Refined" Management to Reduce Pile Foundation Construction Cost
在线阅读 下载PDF
导出
摘要 桩基工程是具有代表性的建筑工程,由于桩基种类繁多,施工工艺差异大,加之底层变化复杂,因此,桩基工程从设计、到实施,再到竣工结算等各环节的成本控制,直接关系到整个工程的总造价成。实行"精细"化工程管理,从个细节成本出发,强调成本事前控制的重要性,是整个工程项目成功的基础。 Pile foundation construction is representative of the building, due to a wide range of pile foundation, major difference of construction technology, combined with the complex underlying changes, the pile foundation from design, implementation to completion of settlement costs and other links control are directly related to the total cost of the whole project. During the process of implementing "fine" project management, starting from a detailed cost and stressing the importance of cost control in advance is the basis of project's success.
作者 骆佩玲
出处 《价值工程》 2010年第24期30-30,共1页 Value Engineering
关键词 优化 商务谈判 交流 履行 管理 结算 分析总结 optimization business negotiations exchange performance management settlement analysis summary
  • 相关文献

参考文献3

  • 1GB13467-1999先张法预皮力混凝土管桩[S].北京:中国标准出版社,2009.14-15.
  • 2贺岩.工程造价控制的重点及对策[J].中外建筑,2006(5):113-114. 被引量:4
  • 3冯为民,付晓灵.工程经济学[M].北京.北京大学出版社,2009:104-107.

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部