摘要
好汉泊水库项目建设中,时间紧、任务重、政治性强、国际影响大,确保费用、进度的统一是保证完成任务的关键。介绍了挣值法在好汉泊水库项目实施中的有效应用。在实际工作中,对比计划费用,实际费用,已完费用3种曲线,找出差异,为决策者提供重要的参考依据。
The Haohanbo Reservoir item in the construction of article,the time is tight,the task is heavy,the politicol nature is stong,the international influence is big.The guarantee completes the key of task is how to ensure the cost and production schedule unify.The variance analysis method was introduced use effectively come to ensure the target complete in this paper.In the practical working,to contrast the three kind curves,an important reference is given to decision-maker.
出处
《黑龙江水专学报》
2010年第2期66-68,共3页
Journal of Heilongjiang Hydraulic Engineering College
关键词
费用控制
挣值法
应用
好汉泊水库
cost control
variance analyse method
application
Haohanbo Reservoir