期刊文献+

某减速器装配线平衡的精益改造研究 被引量:2

An Improvement Study on Assembly Line Balancing Based on Lean Production
在线阅读 下载PDF
导出
摘要 从装配线平衡和精益生产的概念出发,以某企业减速器装配生产线为实例,介绍了精益生产理论在改造装配线平衡问题上的应用。考虑装配生产现场,用鱼刺图分析了影响装配线平衡的各种制约因素,并系统的应用全员"5S"活动,制定标准作业时间,连续流改造以及团队互助协作等精益手段对原装配生产线进行改造。改造结果显示,装配线各工作站作业负荷趋于均衡,整体生产效率得以提高,改造效果明显。 Based on the concept of Assembly Line Balancing (ALB) and Lean Production,this paper introduces the method that how to use lean production theory to solve ALB problem.First,proceed from angle of the production field,using the fishbone chart to analyze various constraints factors which impact the assembly line balancing in a reducer manufacturing company,and then using the tools of lean production theory such as"5S" activities,development of standard operating time,continuous flow and team work in order to improve the situation of the original assembly line.According to the results of improvement,workload of the stations becomes more balanced and productivity gets improved,the effect of the improvement is evident.
出处 《价值工程》 2010年第16期148-150,共3页 Value Engineering
基金 高等学校博士学科点专项科研基金资助课题(200806131014) 中央高校基本科研业务费专项资金资助项目(SWJTU09CX022)
关键词 生产线平衡 精益生产 鱼刺图 assembly line balancing lean production fishbone chart
  • 相关文献

参考文献9

  • 1张则强,程文明,钟斌,王金诺.求解装配线平衡问题的一种改进蚁群算法[J].计算机集成制造系统,2007,13(8):1632-1638. 被引量:37
  • 2SCHOLL A,BECKER C.State-of-the-art exact and heuristic solution procedures for simple assembly line balancing[J].European Journal of Operational Research,2006,168(3):666-693.
  • 3SCHOLL A.Balancing and sequencing of assembly lines[M].2nd ed.Heidelberg Physica-Verlag,1999:34-35.
  • 4SAURIN T A,FERREIRA C,BER F.The impacts of lean production on working conditions:A case study of a harvester assembly line in Brazil[J].International Journal of Industrial Ergonomics,2009,39(2):403-412.
  • 5RANKY P G,SUBRAMANYAM M,CAUDILL R J,et al.Dynamic scheduling and line balancing methods,and software tools for lean and reconfigurable disassembly cells and lines[A].Boston MA,United States:Institute of Electrical and Ehctronics Engineers Inc.,2003.234-239.
  • 6刘文喜.减速器装配线平衡及其对比研究[D] :硕士学位论文.西南石油大学,2009.
  • 7刘光富,马婷婷.基于eM-plant的水洗机装配线平衡分析[J].工业工程与管理,2007,12(3):104-108. 被引量:18
  • 8大野耐一.丰田生产方式[M].中国铁道出版社,2006.
  • 9王立勇,徐克林.装配线平衡中统计波动问题仿真研究[J].工业工程,2007,10(2):125-129. 被引量:7

二级参考文献22

共引文献64

同被引文献11

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部