期刊文献+

黑启动运行模拟与仿真分析

Simulation Analysis on Power System in Black Start
在线阅读 下载PDF
导出
摘要 黑启动电源选择问题是系统大事故后恢复的首要问题。针对该问题,文章通过建立数学模型对各黑启动电源方案进行黑启动运行模拟,计算得出大事故停电损失值的所需的停电持续时间等数据,最后将计算得到的大事故的停电损失值和方案的成本作综合比较,判断各黑启动电源方案的可行性和优劣性。仿真算例说明了该方法的系统性和有效性。 Initial generator selection is the first task in black start of power system.The article proposes a method for determining the number,capability and location of the generating units in the black start of power system according to technical performance index of black start and the characteristics of the generators.In the proposed method,a mathematical model is presented to simulate the process characteristics of black start of power system on the basis of calculating outage loss and outage time,comparing outage losses and the costs of the start solution and judgment of feasibility and superiority of the proposed solutions.Simulation case verifies that the proposed method is systemic and effective.
作者 宁远鸿
出处 《红水河》 2010年第3期109-112,119,共5页 Hongshui River
关键词 电力系统 黑启动 启动电源 全黑事故 power systems black start initial power source black out
  • 相关文献

参考文献4

二级参考文献37

  • 1毛钧焘译.电力系统可靠度和计划的经济性理论和实例分析[M].水利水电出版社,1987..
  • 2Teng Genhao, Lu Channan. Feeder-switch relocation for customer interruption cost minimization[J]. IEEE Trans on Power Delivery[J]. 2002, 17(1): 254-259.
  • 3Billinton R, Jonnavithula S. A test system for teaching overall power system reliability assessment[J]. IEEE Trans on Power Systems, 1996, 11(4): 1670-1676.
  • 4Wang P, Billinton R. Demand-side optimal selection of switching devices in radial distribution system planning, generation,transmission and distribution[J]. IEE Proceedings, 1998, 145(7):409-414.
  • 5Celli G, Pilo F. Optimal sectionalizing switches allocation in distribution networks[J]. IEEE Trans on Power Delivery, 1999, 14(7):1167-1172.
  • 6Allan R N, Billinton R, Sjarief I et al. A reliability test system for educational purposes-basic distribution system data and results[J]. 1EEE Trans on Power Systems, 1991, 6(2): 813-820.
  • 7Shultz R D,Mason G A.Blackstart utilization of remote combustion turbines[J].IEEE Trans on PAS,1984,103(8):2188-2191.
  • 8Lindstorm R R.Simulation and field tests of the black start of a large coal-fired generating station utilizing small remote hydro generation[J].IEEE Trans on Power Systems,1990,5(1):162-168.
  • 9Zhu Y L,Sutanto D,Morrison I F.Graphic-assisted expert system for power system black restart[A].Proceedings of International Conference on Advances in Power System Control,Operation and Management[C].HongKong,1991,1:443-448.
  • 10Fountas N A,Hatziargyriou N D,Orfanogiannis et al.Interactive long-term simulation for power system restoration planning[J].IEEE Trans on Power Systems,1997,12(1):61-68.

共引文献108

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部