期刊文献+

跨既有铁路客专连续梁现浇施工支架设计 被引量:2

Brackets Design in Continuous Cast-in-place Beam Construction Crossing Existing Railway PDL
在线阅读 下载PDF
导出
摘要 跨越既有铁路的连续梁,因受工期的限制,由悬臂灌筑法改为支架现浇法。在对既有接触网线改造的基础上,采用贝雷支架跨越既有铁路,能满足施工中承载力、强度和刚度的要求。以迁菱铁路连续梁现浇施工为例,对碗扣和贝雷支架的力学特性进行了检算,为类似工程施工提供参考。 Due to the construction period limit, continuous beams which cross existing railways adopt bracket cast-in-place method in place of cantilever casting method. Based on the reform of existing contact lines, Bailey bearing brackets are used in crossing existing railway, meeting the requirements of bearing capacity, strength, and rigidity in construction. Tak- ing continuous beam cast-in-place construction of Qianling railway as an example, this paper checks mechanical characteris- tics of bowl scaffolds and Bailey bearing-brackets, which can be references to similar projects.
作者 屈国强
出处 《铁道建筑技术》 2010年第5期79-82,116,共5页 Railway Construction Technology
关键词 连续梁 现浇支架 力学计算 continuous beam cast-in-place beam mechanical calculation
  • 相关文献

参考文献4

二级参考文献3

  • 1[1]龚晓南.深基坑设计与施工手册[M].中国建筑工业出版社,2002.
  • 2[3]道路桥梁施工手册[M].中国建筑工业出版社,2003.
  • 3周永兴.路桥施工计算手册[M].人民交通出版社,2001,2..

共引文献13

同被引文献16

引证文献2

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部