摘要
该文以无锡市清宁大桥部分斜拉桥工程为背景,介绍了预应力混凝土主梁部分斜拉桥的受力特点,施工控制思路和方法,以及清宁大桥部分斜拉桥的施工情况,总结出预应力混凝土主梁部分斜拉桥的施工控制方法和思路。
Taking the partial cable-stayed bridge project of Wuxi City Qingning Bridge as the background,the article introduces the stress characteristics,construction control thinking and method of the partial cable-stayed bridge of the main prestressed concrete beam,and the construction conditions of the partial cable-stayed bridge of Qingning Bridge,and sums up the construction control method and thinking of the partial cable-stayed bridge of the main prestressed concrete beam.
出处
《城市道桥与防洪》
2010年第5期94-98,共5页
Urban Roads Bridges & Flood Control
关键词
部分斜拉桥
受力特点
施工控制
无锡
partial cable-stayed bridge,stress characteristic,construction control,Wuxi