摘要
以珠江三角洲城际快速轨道交通工程为例,介绍了海瑞克盾构机在更换尾刷期间发生的后退过程,并分析其原因,阐述了具体的处理措施和步骤,为今后类似工程提供了经验和指导。
Taking inter-city express tunnel traffic project as an example,the paper introduces Herrenkenecht shield machine's backward process during replacing the tail brush,analyzes its reasons,and illustrates factual treatments and steps,so as to provide experience and direction for similar projects.
出处
《山西建筑》
2010年第15期320-321,共2页
Shanxi Architecture
关键词
盾构机
尾刷
后退
处理措施
shield machine
tail brush
backward
treatment