期刊文献+

暂堵凝胶在水平井堵水中的应用 被引量:8

Application of Temporary-blocking Agent for Water Plugging in Horizontal Wells
在线阅读 下载PDF
导出
摘要 针对筛管完井的水平井在堵水过程中水平段容易被污染的问题,研制了一种新型的地下交联树脂型暂堵凝胶,施工时先挤入暂堵凝胶将水平段非目的层进行保护,迫使堵剂进入目的层,作业结束后72h暂堵凝胶会自动破胶,使水平段的非目的层恢复原来的物性,从而达到保护水平段的目的。2008年对彩南油田筛管完井的4口水平井在堵水过程中采取了暂堵工艺,并取得了成功,其中两口井降水增油效果明显,CHW04水平井含水由97.5%最低降到51%,CHW16水平井含水由82.9%最低降到41.6%,截止2009年9月这两口井累计增油1300余吨。 In view of the pollution in horizontal wells in the process of water plugging for slotted pipe completion,a kind of new subsurface gelling risen temporary blocking agent was developed. The temporary blocking gel was first squeezed into the formation to protect the non-target zones in the horizontal sections to force the blocking agent coming into the ,the diversion gel is pushed in non-target zones to protect the horizontal sections,after 72 hs of operation,the agent would be automatically broken therefore the physical property in non-target zones would be recovered to the original one for the purpose of protecting the horizontal sections .In 2008,temporary blocking technique was used in 4 horizontal wells of slotted pipe completion and better result was obtained in 2 wells. Water cut is reduced from 97.5% to 51% in Horizontal Well CHWO4 and it is reduced from 82.9%to 41.6% in Horizontal Well CHW16.By the end of Sept.2009,the accumulated oil increment was 1300 t in the 2 wells.
出处 《石油天然气学报》 CAS CSCD 北大核心 2010年第2期352-354,共3页 Journal of Oil and Gas Technology
关键词 水平井 筛管完井 堵水 暂堵凝胶 应用 horizontal well slotted pipe completion water plugging temporary blocking gel application
  • 相关文献

参考文献5

二级参考文献30

  • 1吴世旗,钟兴福,刘兴斌,裴春侠.水平井产出剖面测井技术及应用[J].油气井测试,2005,14(2):57-59. 被引量:34
  • 2戴彩丽,赵福麟,李耀林,冯德成,任熵.海上油田水平井底水脊进控制技术[J].石油学报,2005,26(4):69-72. 被引量:38
  • 3贺会群.连续油管技术与装备发展综述[J].石油机械,2006,34(1):1-6. 被引量:183
  • 4侯玫,宋根才,向明光,薄其立,王晓剑,宋永梅,司江涛.水平井堵水工艺管柱的研制与应用[J].石油天然气学报,2005,27(6):787-789. 被引量:15
  • 5朱怀江 刘玉章 熊春明 等.适用于高温高盐油藏的改性栲胶凝胶堵水技术[P].中国专利申请号:02121291.0..
  • 6赵福麟.油田化学[M].东营:石油大学出版社,2000..
  • 7ZAITOUN A,KOHLER N,MONTEMURRO M A.Control of water influx in heavy-oil horizontal wells by polymer treatment[R].SPE 24 661,1992.
  • 8LOVEL LAND K R,BOND A J.Recent application of coiled tubing in remedial wellwork at Prude Bay[R].SPE 35 587,1996.
  • 9FULLEYLOVE R J,MORGAN J C,STEVENS D G.Water shut-off in oil production wells-lessons from 12 treatments[R].SPE 36 211,1996.
  • 10KHALED BORAEI,PHIL FLETCHER,MIKE CRABTREE.Technique forzone isolation in horizontal wells[C].PNEC,Houston,August 10-12,1998.

共引文献68

同被引文献74

引证文献8

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部