摘要 京沪高铁跨娄江连续梁拱桥上部结构设计为(70+136+70)m预应力混凝土连续梁与钢管混凝土拱组合结构。介绍了该桥梁上部设计结构,重点描述了拱肋安装施工技术,采用纵向滑移的方案,和梁体同步施工,节约了时间,保证了工期。 (70 + 136 + 70) m pre-stressed concrete continuous beam and con- crete filled steel tube arch composite structure was designed for the upper structure of continuous beam arch bridge across Lou River for Beijing-Shanghai high-speed railway. The upper structure design of the bridge was introduced, the arch rib'in- stallation construction technology was described emphatically, time was saved and the working period was ensured by adopting scheme of longitudinal slip and simul- taneous construction of beam body.
作者 赵学敏
出处 《工程建设》 2010年第2期45-49,共5页 Engineering Construction
关键词 高速铁路 连续梁拱桥 拱肋安装 施工技术 high-speed railway arch bridge of continuous beam arch rib in- stallation construction technology
  • 相关文献

参考文献4

  • 1交通部第一公路工程总公司.公路施工手册(桥涵)[M].北京:人民交通出版社,2000.
  • 2张建民,郑皆连,秦荣.大跨度钢管混凝土拱桥吊装过程的优化计算方法[J].桥梁建设,2002,32(1):52-54. 被引量:33
  • 3周汉东.大跨度钢管混凝土拱桥拱肋吊装施工控制.哈尔滨建筑大学学报,1997,(2).
  • 4TZ213-2005,客运专线铁路桥涵工程施工技术指南[S].