三峡工程试验性蓄水175m水位运行的相关问题 被引量:14

Some considerations on trial impoundment operation of Three Gorges Project at 175m water level
在线阅读 下载PDF
导出
摘要 三峡工程于2008年汛末开始正常蓄水位175 m试验性蓄水,进入正常蓄水运用前的试验性蓄水运行期。探讨了试验性蓄水运行历时、试验性蓄水运行期的防洪调度和蓄水方案、监测及试验研究工作与其经费等问题;提出了试验性蓄水运行期可暂定5 a,对防洪调度和蓄水方案进行试验研究,加强各项监测及试验研究和库区地质灾害监测预警工作及生态环境保护力度等方案措施,并提出完成上述方案措施所需费用从增发电量收益中解决的建议。 The trial impoundment of Three Gorges Project at normal water level of 175 m at the end of 2008 flood season marked the beginning of TGP′s trial impoundment operation period before its normal operation.The duration,flood control operation and impoundment schemes during the trial impoundment period,as well as the monitoring and trial study tasks and expenses etc.,are discussed,and some suggestions are put forward as follows: the trial impoundment and operation period may temporarily be set as 5 years;trial studies should be carried out on flood control operation and impounding schemes;the monitoring and all trial studies and early warning tasks of geological hazards in the reservoir area and the ecological environment protection should be reinforced and the expenses required shall be paid from the benefit of increased power generation etc..
作者 郑守仁
出处 《人民长江》 北大核心 2010年第8期1-4,23,共5页 Yangtze River
关键词 试验性蓄水 防洪调度 蓄水方案 三峡工程 trial impoundment flood control operation impounding schemes Three Gorges Project
  • 相关文献

参考文献4

  • 1水利部长江水利委员会.长江三峡水利枢纽初步设计报告(枢纽工程)[R].武汉:水利部长江水利委员会,1992.
  • 2陈雷.在长江水利委员会成立六十周年庆祝大会上的讲话[N/OL].人民长江报,2010-02-27(1).
  • 3长江水利委员会水文局.三峡分期洪水专题研究报告[R].武汉:长江水利委员会水文局,2008.
  • 4郑守仁.三峡工程防洪调度中的问题探讨[J].中国三峡建设,2008,15(1):5-8. 被引量:3

二级参考文献2

  • 1长江水利委员会.长江三峡水利枢纽初步设计报告(枢纽工程)[R].1992.12
  • 2长江水利委员会水文局.长江宜昌站逐日平均流量表(1887-2006年).

共引文献4

同被引文献211

引证文献14

二级引证文献192

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部