摘要
随着我国经济的新一轮发展,大规模的基本建设高潮一浪高过一浪,工程项目有如雨后春笋,所遇膨胀土的工程危害及治理的课题,频频发生。以广西某开关站为例,论述膨胀土地区的岩土工程治理经验和教训。
Along with a new development of country economy,there are lots of infrastructure constructions,in which the engineering hazard of swelling soil and its treatment are happened frequently.Combined with the switch station in Guangxi,the geotechnical treatment experience in the swelling soil area is introduced.
出处
《土工基础》
2010年第1期15-18,共4页
Soil Engineering and Foundation
关键词
膨胀土
滑坡
开关站
胀缩等级
swelling soil
landslide
switch station
grade of shrink and expansion