摘要
布置技术是合理利用空间的技术。布置设计优化和系统设计优化相互促进。火力发电厂的布置设计主要包括厂区总平面布置设计和主厂房布置设计,后者是重点。以江西新昌电厂2×660MW超超临界机组工程为例,介绍了在主厂房布置中采用的模块化设计思路和经验。最后,阐述了信息化手段的运用对布置技术的推动。
Layout engineering is the technique on the reasonable usage of plant space.Layout design and system design optimization can promote mutually.The layout design of fossil-fueled power plants includes mainly the general layout and main power building layout,while the later one is the key point.Taking Jiangxi Xinchang Power Plant 2×660 MW USC unit project as an example,the paper introduces primary and secondary modular design experiences in main power building layout and explains that application of information-based way can promote layout engineering.
出处
《电力建设》
2010年第4期82-85,共4页
Electric Power Construction
关键词
布置技术
信息化
模块化设计
精细化设计
layout engineering
information-based
modular design
elaborate design