摘要
基于地质构造复杂程度是一个灰色系统,通过计算地质构造的褶皱平面变形系数、断层密度、断层强度、断裂分维值等复杂程度影响指标,采用灰色模糊综合评价方法对祁东煤矿三采区61煤层的构造复杂程度进行了定量评价,得出了研究区的构造复杂程度综合评价结果图,评价结果与矿井实际揭露情况基本一致。
Due to the complicated degree of the geological tectonics could be regarded as a grey system, with the calculations of the folded plane deformation coefficient, fault density, fault strength, fracture dimension value and other complicated degree influence index of the geological tectonics, the grey fuzzy comprehensive evaluation method was applied to quantitatively evaluate the tectonic complicated degree of the No. 61seam in No. 3 mining block of Qidong Mine. The comprehensive evaluation results drawing of the tectonic complicated degree of the research zone was obtained and the evaluation results was basically as the same to the mine actual released information.
出处
《煤炭科学技术》
CAS
北大核心
2010年第3期101-103,共3页
Coal Science and Technology
关键词
地质构造
定量评价
断裂分维值
复杂程度
geological structure
quantitative assessment
fractal dimension value
complicated degree