期刊文献+

葛洲坝水电站增容改造中机组拆除及蜗壳加固研究 被引量:1

Study on unit disassembly and spiral case reinforcement during capacity-increasing improvement for Gezhouba Hydropower Station
在线阅读 下载PDF
导出
摘要 对葛洲坝水电站蜗壳在机组增容改造前后及机组拆除时的3种状态进行了三维有限元计算。根据计算研究成果提出了增容改造蜗壳部位加固方案并对加固方案进行了有限元计算。通过对增容改造前状态分别与机组拆除、增容改造后以及增容改造加固后3种状态下锥体二期混凝土部位的计算成果对比分析表明,机组拆除方案是可行的,蜗壳的加固方案也是有效的。 Three dimensional FEM is adopted to analyze the stress and deformation of spiral case of Gezhouba Hydropower Station under the statuses : before the capacity-increasing improvement ; during the disassembly of the spiral case ; after the capacity-increasing improvement. Based on the calculation, the reinforcement scheme for the spiral case is proposed, and then the FEM calculation is also made on the scheme. Through the comparative analysis on the phase Ⅱ concrete for the cone section under the three statuses mentioned above, it shows that not only the unit disassembly scheme is feasible, but the reinforcement design is also effective.
出处 《水利水电技术》 CSCD 北大核心 2010年第2期56-59,共4页 Water Resources and Hydropower Engineering
关键词 葛洲坝水电站 增容改造 机组拆除 蜗壳加固 Gezhouba Hydropower Station capacity-increasing improvement unit disassembly spiral case reinforcement
  • 相关文献

参考文献3

二级参考文献3

共引文献7

同被引文献3

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部