代建项目治理成熟度模型的构建 被引量:1

Construction of Agency-construction Project Governance Maturity Model
在线阅读 下载PDF
导出
摘要 首先界定代建制项目治理能力的概念,借鉴"项目管理成熟度即项目管理过程成熟度"的传统框架,提出用项目的决策权配置过程代替项目管理成熟度的管理过程维度,据此构建了代建制项目治理成熟度模型。定义了其关键域及其目标,模型拓展了"项目管理成熟度"管理过程的概念;为代建项目治理能力的评价与持续改进提供一种途径和方法。 Firstly define the concept of agent-construction project governance capacity, refer to the raditional framework of "Project Management Maturity Project Management Process Maturity". The decision-making power of project was proposed to replace the project management process maturity. Thus it was finished to construct agency-construction project governance maturity model. It defined the key field and its goals. The model expands the concept of the management process of the "Project Management Maturity" and provides a means and method for project evaluation and continuous improvement of agency,construction project governance ability.
出处 《价值工程》 2010年第2期236-238,共3页 Value Engineering
关键词 代建制 项目治理 成熟度模型 agency-construction project governance roaturity model
  • 相关文献

参考文献17

二级参考文献37

共引文献68

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部