摘要
应用模拟实验法系统地研究了电厂水力排灰系统冲灰用水的硬度、碱度、pH值及灰水比、流速、混合时间对排灰系统结垢的影响,其结果对解决长期困扰电厂排灰系统防腐阻垢问题具理论和实用意义.
A study of important factors which affect scaling of the hydrodynamic ashdisposal system in power plant such as water hardness,alkalinity,pH value,ashwater ratio,velocity of flowing and mixing time is carried out systematically by simulated experiments.The results are of great theoretical and practical importance in solving the antiscaling problem which have been puzzled the power plant for a long time.
出处
《武汉化工学院学报》
1998年第3期22-25,共4页
Journal of Wuhan Institute of Chemical Technology