摘要
本文对于干灰湿排的燃煤电厂除灰管结垢原因及预脱碳法防垢原理进行了试验研究和探讨,并以山西某典型燃煤电厂为例,对采用总排废水预脱碳处理后作除灰用水的实施工艺及防垢效果进行了分析。
The cause of scaling in ash-removing pipe and the scale-proof principle with the pre-decarbon method were studied for the thermal power plant with wet-discharge of dry ash. And taking a typical coal-fired power plant as an example, the treatment technique of removal and the effect of scale-inhibiting were analyzed.
出处
《水处理技术》
CAS
CSCD
1999年第4期230-234,共5页
Technology of Water Treatment
关键词
燃煤电厂
废水
冲灰水
防垢
coal-fired power plant
waste water
ash-sluicing water
scale-inhibiting