大跨度斜拉桥分离式公轨共面钢箱梁关键施工技术研究 被引量:2

Research of Key Construction Techniques for Separated Steel Box Girders of a Long Span Cable-Stayed Bridge Carrying Both Highway and Light Rail
在线阅读 下载PDF
导出
摘要 上海长江大桥主通航孔桥为双塔双索面钢箱梁斜拉桥,跨径布置为(92+258+730+258+92)m,采用5跨连续全漂浮体系。梁体采用分离式双主梁形式,单个箱梁为扁平闭口流线型结构。介绍箱梁制造、整体转运、现场安装中的关键技术。 The main navigable span bridge of Shanghai Changjiang River Bridge is a steel box girder cable-stayed bridge with double pylons, double cable planes and with span arrangement (92 +258q-730+258+92) m and the bridge is designed as a 5 span continuous full floating system. The main girders of the bridge are of the separated twin girders, each being a streamlined flat closed structure. In this paper, the key techniques for the manufacturing, the integral transportation and field installation of the girders are presented.
出处 《世界桥梁》 北大核心 2009年第A01期46-49,94,共5页 World Bridges
关键词 上海长江大桥 斜拉桥 钢箱梁 桥梁施工 Shanghai Changjiang River Bridge cable-stayed bridge steel box girder bridge construction
  • 相关文献

参考文献2

  • 1上海长江隧桥B5标中港二航局项目经理部.长江大桥主通航孔工程总体施工组织设计[Z].2006.
  • 2秦顺全.桥梁施工控制[M].北京:人民交通出版社,2007:23-25.

共引文献12

同被引文献14

引证文献2

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部