摘要
介绍日本抽水蓄能电站的发展历史、运营现状以及关键技术等方面的情况,结合南方电网区域运行方式呈现的特点,提出了关于南方电网抽水蓄能电站建设的3点建议:加大抽水蓄能电站在电网中的配置比例;加大蓄能电站的建设速度;引进抽水蓄能电站建设新技术。
Through analysis of development history, operational status and key technology of pumped storage power stations in Japan, in consideration of charactersistics in regional operational mode of China South Grid (CSG), this paper puts forward three suggestions on the construction of pumped storage power stations in CSG.: to increase the allocation percentage of the pumped storage power station in CSG; to accelerate its construction; to fetch in the new technology in the station construction.
出处
《南方电网技术》
2009年第5期1-5,共5页
Southern Power System Technology
关键词
抽水蓄能电站
日本
考察
pumped storage power stations
Japan
investigation