3Horman, M., Riley, D., Lapinski, A., etc. Delivering green building project: Process improvements for sustainable construction[J]. Journal of Green Building, 2006 (1):123- 140.
4Xiao ming Mao, Xue qing Zhang. Construction process reengineering by integrating lean principles and computer simulation techniques[J]. Journal of Construction Engineering and Management,2008(5).
5Sven Bertelsen,Lauri Koskela,Guilherme Henrich and John Rooke. Critical flow-towards a construction flow theory[C]. Proceedings IGLC-14,Santiago,Chile,2006.
6Sumit,K.,Majumdar.The impact of size and age on firm- level performance: some evidence from India[J]. Review of Industrial Organization, 1997 (12) : 231-241.
7Bee-Yan Aw,Geeta,Batra.Firm size and the pattern of diversification [J].International Journal of Industrial Organization, 1998(16) :313-331.
8Chamberlin,E.H.The theory of monopolistic competition[M].Cambridge, Mass: Harvard University Press, 1933.
9Bain,J. S..Barriers to new competition[M].Harvard University Press, 1956.
10Meeusen,W. and Broeck,J.,van den.Efficiency estimation from Cobb-Douglas production functions with composed error [J]. International Economic Review,1977 (18) :435-444.