基于CPN的维修保障资源配置建模与仿真方法 被引量:4

Modeling and Simulation Method of Maintenance Support Resources Deployment Based on CPN
在线阅读 下载PDF
导出
摘要 优化配置维修保障资源是战时提高装备维修保障效能的有效途径。提供一种建模与仿真的方法,实现对资源配置的定量研究。首先,基于有色Petri网,结合任务实例,研究维修保障任务模型和维修保障资源模型的建模方法,然后结合任务实例构建了维修保障资源配置的CPN模型,并利用CPNTools对模型进行仿真研究,对任务的执行时间,资源冲突,资源利用率,资源再分配等问题进行分析。实例证明,该方法是面向任务的维修保障资源优化配置的有效方法。 Logical resource deployment is an efficient way to improve maintenance support power. A new method is presented for modeling and simulation, quantify research of resource deployment is achieved. First, Based on colored Petri net, a way of modeling maintenance support task and modeling maintenance support resource, as well as modeling method are given. Also, using CPN Tools, simulation is proposed to run a maintenance support task model, analysis of task's execution time, resource conflict, resource utilize percentage and resource redeployment. Example proves the method has an efficient way of modeling and simulating for equipment maintenance support.
出处 《兵工自动化》 2009年第9期33-36,共4页 Ordnance Industry Automation
关键词 维修保障 资源配置 仿真研究 Maintenance support Resources deployment Simulation
  • 相关文献

参考文献7

二级参考文献27

  • 1刘春林,何建敏,盛昭瀚.应急系统多出救点选择问题的模糊规划方法[J].管理工程学报,1999,13(4):21-24. 被引量:12
  • 2苏小波,冀亚林.元数据及其在装备管理数据集成中的应用[J].四川兵工学报,2007,28(2):38-40. 被引量:1
  • 3马绍民,章国栋.综合保障工程.北京:国防工业出版社,1995.
  • 4[3]宋建设,曹小平,曹耀钦,等.装备维修信息化工程[M].北京:国防工业出版社,2005.
  • 5[4]David M Kroenke.数据库处理:基础、设计与实现[M].施伯乐,顾宁,孙未来,译.北京:电子工业出版社,2006.
  • 6[5]Sharon Allen.数据建模基础教程[M].李化,译.北京:清华大学出版社,2004.
  • 7[8]周中元.信息系统建模方法[EB/OL].[2006-04-26].http://dev.csdn.net/article/13/13034.shtm.
  • 8Bottcher J, Drexl A, Kolisch R. A branch and bound procedure for project scheduling with partially renewable resource constraints[C]. Proceedings of the 5th International Workshop on Project Management and Scheduling, Poznan, 1996, 4:48 - 51.
  • 9Brucker P, Drexl A, Mohring R, et al. Resource-constrained project scheduling: Notation, classification, models and methods[J]. European Journal of Operational Research, 1999, 112:3 -41.
  • 10Herroelen W, Reyck B D, Demeulemeester E. Resource-constrained project scheduling: a survey of recent developments[J].Computers & Ops. Res,1998, 25(4) :279 - 302.

共引文献36

同被引文献45

引证文献4

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部