3Bottcher J, Drexl A, Kolisch R. A branch and bound procedure for project scheduling with partially renewable resource constraints[C]. Proceedings of the 5th International Workshop on Project Management and Scheduling, Poznan, 1996, 4:48 - 51.
4Brucker P, Drexl A, Mohring R, et al. Resource-constrained project scheduling: Notation, classification, models and methods[J]. European Journal of Operational Research, 1999, 112:3 -41.
5Herroelen W, Reyck B D, Demeulemeester E. Resource-constrained project scheduling: a survey of recent developments[J].Computers & Ops. Res,1998, 25(4) :279 - 302.
6Kaplan L. Resource-constrained project scheduling with preemption of jobs[D]. Ann Arbor, MI:University of Michigan, 1988.
7Jansen J, Ohring S. Approximation algorithms for time constrained scheduling[J]. Information and Computation, 1997,132: 85- 108.
8Wybo Jean-Luc. FMIS: a decision support system for forest fire prevention and fighting[J]. IEEE Transactions on Engineering Management, 1998, 45(2) : 127 - 131.
9Hays W W. Reduction of earthquake risk in the United States:bridging the gap between research and practice[J]. IEEE Transactions on Engineering Management, 1998, 45(2) : 176 - 180.
10Stitson M O, Weston J A E,Gammerman A,et al.Theory of Support Vector Machines [R]. Technical Report CSD-TD-96-17 [R]. Royal Holloway,University of London 1996.