PERT图在系统优化中的应用

Application of PERT Diagram in the System Optimization
在线阅读 下载PDF
导出
摘要 对于一个系统的优化,除了采用系统工程中常用的数学方法外,还可以采用对计划评审技术所对应的PERT图进行相应的调整处理,达到对系统资源分配进行优化,以提高系统效率的目的。这种方法的具体做法是:通过对PERT图中的关键路径和最短路径的长度进行调整,即通过调整这两种通路上的边所对应的资源分配,以此提高系统效率。该方法简单直观,因此在系统优化中具有较大的实用价值。 With respect to optimizing a system, apart from the common mathematical approaches in the systems engineering, the PERT diagram corresponding to program evaluation and review technique can also be applied to achieve optimization of the systems resources allocation so as to increase the systems efficiency. The concrete procedure of this method is by adjusting the lengths of the critical path and the shortest path in the PERT diagram, i.e. adjusting the resources allocation corresponding to the lines of both paths to increase the systems efficiency. With its simplicity and visibility, the great practical value is possessed in the system optimization.
作者 黄元清
出处 《四川理工学院学报(自然科学版)》 CAS 2009年第4期59-61,共3页 Journal of Sichuan University of Science & Engineering(Natural Science Edition)
关键词 PERT图 系统优化 应用 PERT diagram system optimization application
  • 相关文献

参考文献4

二级参考文献11

  • 1Prade H. Using fuzzy set theory in a scheduling problem: A case study[J]. Fuzzy Sets and Systems, 1979, 2:153-165.
  • 2Gazdik I. Fuzzy-network planning-FNET[J]. IEEE Transaction on Reliability, 1983, 32(3) : 304-313.
  • 3Nasution S H. Fuzzy critical path method[J]. IEEE Transaction on Systems, Man and Cybernetics, 1994, 24(1):48-57.
  • 4Jin-Shing Yao, Feng-Tse Lin. Fuzzy critical path method based on signed distance ranking of fuzzy numbers[J].IEEE Transaction on Systems, Man and Cybernetics-Part A, 2000, 30(1): 76-82.
  • 5Hapke M, Slowinski R. Fuzzy priority heuristics for project scheduling[J]. Fuzzy Sets and Systems, 1996, 83(3):291-299.
  • 6Don-Lin Mon, Ching-Hsue Cheng, Han-Chung Lu. Application of fuzzy distributions on project management[J].Fuzzy Sets and Systems, 1995, 73(3): 227-234.
  • 7杨应玖,杨毅,杨念.论灰色网络计划技术[J].武汉水利电力大学学报,1998,31(3):94-99. 被引量:14
  • 8杨冰,谢成辉.复杂网络计划时间参数计算[J].计算机辅助工程,2001,10(2):19-24. 被引量:7
  • 9苏一丹,梁正友.工程网络计划的时间参数与关键路径算法研究[J].广西大学学报(自然科学版),2001,26(2):95-97. 被引量:7
  • 10潘捷,董章震,邓家禔.工作流活动网络图主关键路径的确定[J].计算机与数字工程,2002,30(6):26-31. 被引量:7

共引文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部