摘要
通过对某工程外墙干挂埃特板施工过程进行分析,从测量、角码、龙骨、埃特板、注胶等方面进行了论述,总结了干挂埃特板施工要点,并有针对性的提出相关质量控制措施,从而确保施工质量。
According to the analysis of the construction process for dry hanging calcium silicate board of exterior wall,the paper illustrates from those aspects,the measure,the corner connection,the keel beam,the calcium silicate board,sealant,sums up the construction points for the dry hanging calcium silicate board,and points out some relative measures for quality control,so as to assure construction quality.
出处
《山西建筑》
2009年第25期240-241,共2页
Shanxi Architecture
关键词
干挂埃特板
角码
龙骨
密封胶
质量控制
dry hanging calcium silicate board
corner connection
keel beam
sealant
quality control