摘要
文章研究了装配生产线平衡的问题,针对某车桥公司后桥装配线工序节拍不均衡的现状,运用精益生产方法,测定工序作业时间,消除不必要的浪费动作,按照平衡工序节拍的原则调整工序作业内容,制定作业标准,提高工人的操作技能,改进装配线的生产状况,使装配线各工序节拍趋于一致,通过平衡前与平衡后的相关参数分析,取得了明显的改善效果,提高了生产线的生产效率。
This article deals with assembly line balancing. Focusing on unbalancing issue of axle assembly line of an axle company, it's measured the time of operation tasks and eliminated the waste action with the lean production method. It' s also worked out an operation standard which keeps the assembly line better balanced. So it improved workers' abilities and the production line. By analyzing the data between the old line and the new line, it showed obvious improvements and higher productivity of the assembly line.
出处
《组合机床与自动化加工技术》
北大核心
2009年第8期109-112,共4页
Modular Machine Tool & Automatic Manufacturing Technique