期刊文献+

无锡市城北污水处理厂升级改造工艺设计 被引量:17

Design for upgrading reconstruction process of Chengbei Wastewater Treatment Plant in Wuxi City
在线阅读 下载PDF
导出
摘要 无锡市城北污水处理厂升级改造工程设计规模15万m3/d,采用强化二级生物脱氮除磷以及增加三级盘片式微过滤工艺进行改造,出水达到《城镇污水处理厂污染物排放标准》(GB18918—2002)中的一级A排放标准。介绍了升级改造工程处理工艺选择、工程设计参数、设备配置情况等,总结分析了升级改造工艺设计的技术特点和要求。 The design capacity of the upgrading reconstruction project of Chengbei Wastewater Treatment Plant in Wuxi was 150 000 m^3/d. In the project, the enhanced secondary biological nitrogen and phosphorus removal process and tertiary plate microfiltration process were employed, and the effluent met the first class A standards specified in Discharge standard of pollutants for municipal wastewater treatment plant (GB 18918--2002). The process scheme, design parameters, equipments configuration were discussed, and the technical features and requirement of this upgrading reconstruction design were also summarized and analyzed.
出处 《给水排水》 CSCD 北大核心 2009年第6期29-34,共6页 Water & Wastewater Engineering
关键词 污水处理厂 升级改造 回流污泥 曝气再生 生物脱氮 微过滤 无锡市 Wastewater treatment plant Upgrading reconstruction Recycling sludge Aeration regeneration Biological nitrogen removal Microfiltration Wuxi City
  • 相关文献

参考文献4

二级参考文献11

共引文献105

同被引文献123

引证文献17

二级引证文献142

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部