京石段临时用地复垦工程典型设计 被引量:10

The Typical Design of Land Reclaim for Temporary Land Occupation in Jinshi Section Project
在线阅读 下载PDF
导出
摘要 南水北调中线工程占压了大量的临时用地,其中相当一部分是耕园地,根据《中华人民共和国土地管理法》等有关的法律法规,大部分应进行复垦。结合南水北调工程的实际情况,选取弃土弃渣场、生产生活营区等几个典型从复垦程序、复垦步骤、工程量等方面进行设计,一方面规范复垦内容,另一方面为复垦工程投资计算等提供依据。 In the South-to-North Water Transfer Project, there are large area of land been occupied temporarily, part of which is cultivated land. According to the Land Act and other laws, the temporary occupied land must be reclaimed. Considering the real situation in the South-to-North Water Transfer Project, typical dreg field and living area are selected and the land reclaim process is designed, which can normalize the land reclaim process and calculate the investment.
出处 《南水北调与水利科技》 CAS CSCD 2008年第A06期37-39,共3页 South-to-North Water Transfers and Water Science & Technology
关键词 南水北调工程 临时用地 复垦设计 the South-to-North Water Transfer Project temporary land occupation land reclaim
  • 相关文献

参考文献1

  • 1河北省水利水电勘测设计研究院.南水北调中线京石段应急供水工程石家庄至北拒马河段弃土弃渣场地变更报告[R].河北省水利水电勘测设计研究院,2007.

共引文献3

同被引文献85

引证文献10

二级引证文献72

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部