客运专线制存梁场设计的关键问题研究 被引量:21

RESEARCH ON KEY ISSUES RELATED TO DESIGN OF GIRDER FABRICATION AND STORAGE YARD FOR PASSENGER DEDICATED RAILWAY LINE
在线阅读 下载PDF
导出
摘要 针对梁场选址、布置形式、规模确定等客运专线制存梁场设计中几个关键问题进行分析论述,并介绍了梁场规模确定的方法。经分析探讨得出梁涵盖范围40 km和运梁距离20 km左右,且布置于供应范围的中部等结论,为制存梁场的设计提供了思路和依据。 The analysis in made for the key issues related to design of girder fabrication and storage yard for passenger dedicated railway line, such as site selection, layout form and scale of the yard in this paper. The conclusion is made the cover scope for supplying girder is 40 km and the distance to transport girder is 20 km as well as the yard site should be located at the centre. This provides the thought and basis for design of the yard.
作者 孙国新
出处 《铁道工程学报》 EI 北大核心 2005年第4期5-8,共4页 Journal of Railway Engineering Society
关键词 客运专线 制存梁场 设计方案 passenger dedicated railway line girder fabrication and storage yard design scheme
  • 相关文献

同被引文献78

引证文献21

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部