期刊文献+

双壁钢吊箱围堰的仿真计算及施工关键技术 被引量:8

Simulation Calculation and Some Key Techniques for Construction of Double-Wall Steel Boxed Cofferdam
在线阅读 下载PDF
导出
摘要 介绍武汉天兴洲公铁两用长江大桥北汊公路桥深水承台施工所采用的钢吊箱围堰的结构形式,采用结构仿真分析软件MSC-PATRAN对其进行仿真计算。最后介绍钢吊箱围堰施工的几项关键技术,包括悬吊系统的设计、钢吊箱的下沉与定位、封底混凝土的浇注和体系转换。 This paper presents the structural type of steel boxed cofferdam used for construction of the deep water pile cap of the north highway bridge of Wuhan Tianxingzhou Changjiang River Rail-cum-Road Bridge, makes the simulation calculation of the cofferdam, using the strueture simulation analysis software MSC-PATRAN and also gives some key techniques for construction of the cofferdam, including those of the design of the suspension system, lowering and positioning, casting of the bottom sealing treime concrete as well as the system transferring of the cofferdam.
出处 《桥梁建设》 EI CSCD 北大核心 2009年第2期72-75,共4页 Bridge Construction
关键词 深水承台 双壁钢吊箱围堰 仿真分析 施工方法 deep water pile cap double-wall steel boxed cofferdam simulation analysis construction method
  • 相关文献

参考文献3

二级参考文献5

同被引文献43

引证文献8

二级引证文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部