深圳换流站最后断路器及线路保护的改进建议 被引量:16

Suggestions to Improve the Last Circuit Breaker and Line Protection at Shenzhen Converter Station
在线阅读 下载PDF
导出
摘要 介绍兴安直流输电工程深圳换流站交流开关场4类最后断路器及线路保护逻辑。基于这些逻辑对兴安直流实际工程调试过程中出现的保护动作异常情况进行分析,对相关的设计缺陷,例如交流滤波器连线保护跳闸继电器自保持,无法对5072断路器合闸;最后线路无自动重合闸闭锁功能等,提出了改进建议。有的建议已被设备厂家所采用。 The 4 types of last CB/Line protection logic at 500 kV AC yard of Shenzhen Converter Station in Xing-An HVDC Project are introduced. With the logic the paper analyzes the protection's abnormal actions that occurred in the test process of the HVDC project, and points out the design defects that could cause the abnormal actions, such as the trip relay's self-holding of AC filter connection protection that could result in 5072 breaker not close, the last line's auto-reclosing can't be blocked and so on. Suggestions to overcome these design defects are put forward, and some of them have been adopted by manufacturers.
作者 江一 夏拥
出处 《南方电网技术》 2009年第1期69-71,共3页 Southern Power System Technology
关键词 高压直流输电系统 最后断路器 断路器保护 线路保护 HVDC system last circuit breaker circuit breaker protection line protection
  • 相关文献

参考文献1

二级参考文献2

  • 1戴熙杰.直流输电[M].北京:电力工业出版社,1982..
  • 2Matern.AC Station Control System Information Manual[R].SIEMENS Technical Report ID.03 AT 53,2003,EB2.371.AZ-0:1- 46.?A

共引文献9

同被引文献123

引证文献16

二级引证文献51

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部