摘要
提出采用具有附加线性约束的网络规划法,可把混联梯级水电站分解为几个子网络,简化了每个子网络的求解计算,从而加速大电网复杂的经济调度的计算速度。
Using the method of network flow planning with sideconstrain,the complex coupling cascade hydropower station may be divided into several subsystems.It makes the solution of every subsystem become more simple, and accelerate the calculation speed of complex economic dispatching of large power system.
出处
《广西水利水电》
1998年第1期11-14,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
梯级水电站
经济调度
网络规划法
网络分析
complex coupling, cascade hydropower station, economic dispatching,side constrain, method of network flow planning