工程项目采购供应链中的竞合博弈 被引量:26

Co-Opetition Game of Supply Chain in Engineering Procurement
在线阅读 下载PDF
导出
摘要 供应商、承包商与业主构成了工程项目采购中的供应链,在长期的工程建设与采购中,业主与承包商具有合作的动机。文章基于演化博弈论的方法,研究了工程采购中业主与承包商合作的演化方向及影响因素,研究表明:在非契约条件下,双方合作的概率与合作的超额收益呈正向关系,与合作成本及背叛收益呈反向关系,而为合作超额收益制定合理的分配系数是双方持续合作的必要条件;在签订了联盟合同后,背叛将受到惩罚,此时双方演化的结果将是均选择合作策略。 The supplier, contractor and client constitute a supply chain in engineering procurement. Through long-term construction and purchase, the client and the contractor have the motivation of cooperation. Based on evolutionary game theory, the paper studies the evolutionary direction of co-opetition between client and contractor, and analyzes the influencing factors. The result shows that the probability of cooperation of both sides has a positive correlation with excess return and a negative correlation with cost of cooperation and betrayal income. Reasonable partition coefficient to distribute the excess return is a necessary condition for both sides' sustained cooperation. In the case of an alliance contract, betrayal will be punished, and cooperation of both sides will be the evolutionary direction.
作者 许婷
出处 《中国管理科学》 CSSCI 北大核心 2009年第1期83-88,共6页 Chinese Journal of Management Science
基金 国家自然科学基金资助项目(70731002) "十一五"国家科技支撑计划项目子课题(2006BAG04B06)
关键词 工程采购 供应链 竞合 演化博弈 engineering procurement supply chain co-opetition evolutionary game
  • 相关文献

参考文献19

  • 1Assaf SA, AL-Khalil M, Al-Hazmi M. Cause of delay in large building construction projects[J].Journal of Management in Engineering, 1995, 11(2):45-50.
  • 2Kumaraswamy MM, Chan WM. Contributors to construction delays[J]. Construction Management and Economics, 1998, 16(1):17-29.
  • 3Marrewijk AV, Clegg SR, Pitsis TS, Veenswijk M. Managing public-private megaprojects: Paradoxes, complexity, and project design[J]. International Journal of Project Management, 2008, 26(6): 591-600.
  • 4Flyvbjerg B, Holm S, Buhl S. Underestimating costs in public work projects. Error or lie?[J]. Journal of the American Planning Association, 2002, 68(3): 279- 295.
  • 5Black C, Akintoye A, Fitzgerald E. An analysis of success factors and benefits of partnering in construction [J ]. International Journal of Project Management, 2000, 18(6):423-434.
  • 6Lazer FD. Project partnering: improving the likelihood of win/win outcomes[J]. Journal of Management in Engineering, 2000, 16(2): 71-83.
  • 7Kim K, Paulson BC Jr, Petrie CJ Jr. Agent based electronic markets for project supply chain coordination [Z]. http:// www. igee. umbc. edu/kbem/kinal/kim.pdf.
  • 8Saad M, Jones M, James P. A review of the progress towards the adoption of supply chain management (SCM) relationships in construction[J]. European Journal of Purchasing and Supply Management, 2002, 8(3) : 173-183.
  • 9Akintoye A, McIntosh G, Fitzgerald E. A survey of supply chain collaboration and management in the UK construction industry[J]. European Journal of Purchasing and Supply Management, 2000, 6 (3-4):159-168.
  • 10Chen WT, Chen TT. Critical success factors for construction partnering in Taiwan[J]. International Journal of Project Management, 2007, 25(5):475-484.

共引文献20

同被引文献304

引证文献26

二级引证文献166

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部