5Moore R J. Aspects of uncertainty, reliability, and risk in flood forecasting system incorporating weather radar[ A]. Bogardi J J, Kundzewicz Z W. Risk, Realiability, Uncertainty, And Robustness of Water Resources Systems[ C]. New York: Cambridge University Press, 2002.
6SL274-2001.碾压式土石坝设计规范[S].北京:中国水利水电出版社,2002.
7吕书华.丹江口水库优化调度兴利效益显著.人民长江,2000,(9):20-22.
8CHOI K S X.Turblent Drag Reduction Using Compliant[J].Proc R Soc Lond,1997,(453):2229-2240.
9Sun Ying, Chen Zhohe, Li Qijun. Increasing the economic benefits of taihe reservoir by means of overtopping risk analysis[A] .Proc. of 29th IAHR Congress[C]. Tsinghua University Press. Beijing, China.2001,281- 287.