悬索桥施工中主缆横截面平均温度实用计算法 被引量:12

Practical Method for Calculating the Mean Temperature of the Main Cable Section in the Construction Control of Suspension Bridges
在线阅读 下载PDF
导出
摘要 在悬索桥的施工控制中,需要对空缆状态主缆横截面的边界点温度进行测量,从而求得主缆的平均温度笔者从热传导方程出发,揭示了主缆这种由钢丝和空隙组成的截面的温度分布,提出了主缆横截面平均温度的实用计算方法算例和实测结果对比表明,该法具有良好的精度. In the construction control of suspension bridges, it is required that the temperatures of border point ofmain cable section under the single cable condition be measured so as to obtain the mean temperature of the main ca-ble. From the thermal transfer eqrations, the temperature distribution of the main cable section, which is composed ofwires and voids, is revealed. A practical method which can be used to calculate the mean temperature of main cablesection is developed. A comparison between the numerical examples and the experimental results is carried out. Theresults show that the method is relatively acculate.
出处 《同济大学学报(自然科学版)》 EI CAS CSCD 北大核心 1998年第2期114-119,共6页 Journal of Tongji University:Natural Science
基金 国家科委攀登B计划资助!85-40
关键词 悬索桥 施工控制 主缆 平均温度 Construction control of suspension bridge Main cable Mean temperature
  • 相关文献

参考文献4

  • 1潘永仁,1996年
  • 2郭宽良,计算传热学,1988年
  • 3孔祥谦,有限单元法在传热学中的应用(第2版),1986年
  • 4章熙民,传热学,1985年

同被引文献67

引证文献12

二级引证文献100

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部