摘要
500 kV王店变汾王5439线在串内启动期间,运行人员按照新设备投产启动方案,在切换电流互感器二次大电流端子时,引起被启动500 kV线路保护中反时限方向零序电流保护动作;对动作行为进行详细的分析,并对防止类似异常出现提出了解决方案。
During the start-up period of part of the Fengwang 5439 line of 500 kV Wangdian Substation, the inverse time directional zero-sequence current protection for the 500 kV line acted when the operator switched the current terminals of the current transformer according to the planned start-up scheme for new equipment. The action of the protection is analyzed, and are proposed
出处
《华东电力》
北大核心
2008年第10期151-152,共2页
East China Electric Power
关键词
500kV
线路保护
两点接地
零序保护
500 kV
line protection
two-point grounding
zero-sequence protection